|
|
TechComm Simulation leads the way for providing Commissioning Support and
Post Commissioning Handover Services, in Australia and the South Pacific
Region. Included in our experience is supply of staff from Commissioning
Coordinators through to Start-up Technicians for Coal Fired, Combined Cycle,
Gas Turbine, Cogeneration & Biomass Power Plant.
Categories of Commissioning/Start-up Crews include: 1.Commissioning Co-ordinator Coordination of all Commissioning activities with the consortium Site Manager to ensure continuity of performance/run tests, start-up programs, and scheduling of each Commissioning managers activities assuring a smooth interface of commissioning, engineering, construction and owners start-up program. 2.Operator Commissioning Engineers Responsible for the performance of start-up and test program activities within their respective scope of work. 3.Commissioning Engineers Conducting test procedures for the performance of all phases of test and start up programs including, review, interpretation and if necessary, corrective action for all data obtained to ensure systems and equipment are performing in accordance with engineering design and Operational specification requirements. Complete documentation preparation of systems for handover to Owners Operation Department and support in the unity start-up phase of start-up program. Responsibilities also include the management and monitoring of the safety-tagging program in accordance with safety procedures. 4.Engineers
5.Electrical Inspectors Provide comprehensive inspection of electrical wiring (power, control & instrumentation) installed in accordance with design documentation. Responsibilities include insulation resistance (meggering) and continuity testing to verify cable integrity and terminations.
6.Mechanical Inspectors Ensure all mechanical equipment is installed in accordance with design documents. Final coupling alignment performed after bump and run of motor. Lubrication and alignment forms attached to this procedure are used to record appropriate data. All rotating equipment misalignment or pipe stress is returned to the commissioning manager for corrective action. |
| © Copyright 2008 TechComm Simulation Terms of Use Privacy Guidelines Sitemap Useful links |